Industrial buyers rank robustness first. Hospitality ranks two other things first: the device is seen by guests, and it is handed to staff who were trained this morning. A build that wins on a construction site can be the wrong answer in a lobby for exactly those reasons.

What this note does not do

This note explains how the decision is made. It does not quote a quantity, a channel count for a specific property or an installation recommendation, because the site does not hold one it can evidence. Anything shown as unconfirmed on the catalogue pages is unconfirmed here too.

Confirm the position with your regulator, your site authority or your freight forwarder before you commit to an order.

How to use this note

  1. Map your departments onto the roles in the table below — that produces the channel plan.
  2. Check the recorded channel capacities in this catalogue against that plan.
  3. Send the department list and the number of radios per department.

Roles and what each actually needs

Department to specification logic
RoleWhat the device has to doWhat to confirm
Front desk and conciergeDiscreet, quiet, worn all shift. The device is in view of guests.Audio accessory type, since it is driven by the uniform and not by the radio.
HousekeepingCarried continuously, often with cleaning equipment. Shift-length battery.Weight and battery endurance against your shift pattern, not against a standard figure.
Security and patrolReaches further, may need to be understood under noise.Whether patrol routes leave the building footprint and whether coverage holds at the perimeter.
Food and beverageHigh message volume, minimal tolerance for learning time.A channel plan simple enough to teach in a shift.
Engineering and back of houseBelow ground, plant rooms, service corridors.Whether coverage actually reaches those areas — a lobby walk test will not show it.
Events and banquetingTemporary teams, temporary venues, often a different spectrum permission.Whether the venue operates on temporary permissions that cover your operating dates.

How many channels, and how the catalogue helps

Channel count is driven by the plan, not by the property size. A five-department plan with a service channel and a spare fits comfortably inside the smallest capacity recorded here. The capacities below are what this catalogue records — they are a ceiling on the plan, not a target.

Recorded channel capacities, by number of identifiers
Recorded channel capacityIdentifiers
100025
300016
1612
6412
5129
328
1000 (standard); 3000 (Enhancement Level 2)7
2557
TETRA network group/folder management (not a conventional channel count)7
8706
996
12005
12505
512 (standard); 1000 (extended)5
1000 (standard); 3000 (extended)4
1284
512 (standard); 1000 (Enhancement Level 1)4
Fixed channel count not stated in the supplied configuration data4
1603
96 (standard); 1200 (Enhanced Zone Bank)3
MPT system capacity (not a fixed conventional channel count)3
TMO 2048 talkgroups; DMO 1024 talkgroups3
16 (DM1400) /160 (DM1600, firmware-dependent)2
16 (GP340Ex) / 255 (GP380Ex)2
2562
Official documentation does not confirm a fixed value2
101
1001
16 (conventional channels; exact capacity depends on the system configuration)1
51
61
81
961
Source not confirmed — request verification1
System-dependent (Motorola official specification: system-dependent)1

Temporary spectrum is a real constraint

Event venues frequently operate on temporary permissions. A radio that is lawful in the venue next week may not be lawful on your dates. Confirm the permission for the operating period before deploying, and treat this as a separate question from which handset to buy.

What changes from an industrial specification

  • Presentation outranks ingress protection. A slim build is chosen where the device is seen; an IP rating chosen for a plant room is not the deciding field.
  • Audio accessories drive the selection. The earpiece or speaker microphone is chosen against the uniform, and it is decided before the handset.
  • Training time is a specification field. A plan a temporary employee cannot learn in one shift produces faults that look like equipment faults.
  • Ingress protection still matters where the work happens — pools, kitchens and laundries are wet environments, and the recorded rating should be checked per area.

Not covered here

  • A recommended model for a named property. That needs the department list and a coverage check.
  • Quantity. How many radios a property needs follows from shift overlaps, not from room count.
  • Any statement that a specific build is approved at a specific venue.

What to put in the first message

Every one of these removes a round trip. The enquiry page composes a brief containing them; you send it from your own mail or messaging app.

  • Destination country — this decides the approved variant and the marking.
  • The frequency range you are licensed to use, in MHz.
  • Quantity per site, and whether spares are included in that number.
  • Operating environment, if it is classified (hazardous area, mine, tunnel).
  • Whether the units must arrive programmed, and if so the channel plan.
  • Departments and the number of radios per department.
  • Shift pattern and how the handset is carried — belt, lanyard, in hand.
  • Uniform or dress code, since it constrains the audio accessory.
  • Whether any part of the site is below ground, wet or a separate temporary venue.

Questions this note answers

Buyer notes are written from the catalogue and the published reference pages. They carry no parameter the site cannot evidence, and an unconfirmed value stays unconfirmed here too. BaltiGo is a trading and distribution company supplying Motorola two-way radio hardware into Saudi Arabia and the wider GCC, and does not claim to be a Motorola authorised dealer or official distributor.

Enquiry

Send the configuration, not just the model name

Band, destination and quantity decide whether a quotation is usable in one round or three. Compose the brief and it carries all three.

Compose an enquiry